Project Post Test 2
Concord, North Carolina
Date: October 30 2026
Project Type: Engineering, Stair Design
About Project Post Test 2
Drye-McGlamery Engineering designed structural framing to support a new 5′ x 18′ custom roof equipment hatch used to service plant equipment at the water treatment facility in North Carolina. Drye-McGlamery Engineering has also designed a stainless-steel rolling platform to support maintenance operations on existing stainless-steel tanks inside the production facility.
Drye-McGlamery Engineering has design structural steel frames for existing pipe racks for process piping and miscellaneous mechanical support steel to support ongoing plant operations and upgrades.